Category: All news
New pipe between Oxelösund and Nyköping
After many years of reflection and research, Oxelö Energi and Vattenfall have agreed to build a district heating pipe between Nyköping and Oxelösund. FVB was ...
FVB expands within water and sewage
FVB continues to expand within water and sewage, and has recruited Patrik Andersson for the Gävle office to accelerate the process. FVB has worked with water ...
The CEO's column
Not everything works out as we expect, but sometimes it’s all for the best When I passed through the gates of KTH, the Royal Institute of ...
New technique fixes district heating leak in Örebro
The carbon fibre lining had to be carefully rolled out to prevent it getting abraded and therefore damaged. (Photo: Dennis Hild-Walett). When Navirum Energi was hit ...
District heating line being moved from aqueduct
FVB has been given an exciting assignment to reroute the district heating line between Norrköping and Söderköping. The reason for the rerouting is that a ...
FVB conducts a follow-up study on Europe's largest hot water reservoir
In Västerås, Mälarenergi is building Europe’s largest hot water reservoir in a rock cavern. The reservoir will hold 300,000 cubic meters of water, which can ...
VR has major benefits for design
This is what it might look like moving around the computer model with the VR headset. “It was an ‘aha’ experience,” says Lennart Bolin, Facility Manager ...
Per Skoglund is the new CEO of FVB
Per Skoglund (left) takes over the helm at FVB at the start of the new year. Current CEO Leif Breitholtz will become Senior Advisor with ...