Control system for the Idre sewage treatment plant
![Helsingland PA220882 ny](https://www.fvb.se/app/uploads/2023/12/helsingland-pa220882-ny-1500x843-200x112.jpg 200w 112h, https://www.fvb.se/app/uploads/2023/12/helsingland-pa220882-ny-1500x843-400x225.jpg 400w 225h, https://www.fvb.se/app/uploads/2023/12/helsingland-pa220882-ny-1500x843-600x337.jpg 600w 337h, https://www.fvb.se/app/uploads/2023/12/helsingland-pa220882-ny-1500x843-750x422.jpg 750w 422h, https://www.fvb.se/app/uploads/2023/12/helsingland-pa220882-ny-1500x843-1024x575.jpg 1024w 575h, https://www.fvb.se/app/uploads/2023/12/helsingland-pa220882-ny-1500x843-1499x842.jpg 1499w 842h)
The sewage treatment plant at Idre was expanded in 2012 and the time had come to replace the control system. FVB won the contract from NODAVA AB (Norra Dalarna Vatten & Avfall) to replace the existing control system at the plan with an ABB 800M, and to connect it to the main system consisting of an ABB Compact HMI800.
The contract included electrical construction, programming and commissioning.